CCR Rule Compliance Data and Information
Skippers Storage Facility · Virginia DEQ Solid Waste Permit No. 632 · ERI Development, LLC, owner and operator
This page is maintained under 40 CFR 257.107, the federal rule governing the disposal of coal combustion residuals (CCR). It holds the documents the rule requires the facility to make public for the CCR landfill unit at 234 Forest Road, Skippers, Greensville County, Virginia. Documents are posted within 30 days of being placed in the facility operating record and remain available for at least five years.
No registration or request is needed. Each file can be viewed, printed and downloaded. Questions about the facility or this page: ccr@eri-waste.com or write to ERI Development, LLC, 8007 Aberdeen Road, Bethesda, Maryland 20814.
About the facility
The Skippers Storage Facility receives coal combustion residuals by rail from Dominion Energy's Chesterfield Power Station and places them in a lined storage unit of three cells covering 27.9 acres. Stored CCR is later excavated and processed on site into a cementitious material for concrete, so the unit is intended to be emptied through beneficial use rather than closed in place. The facility is regulated by the Virginia Department of Environmental Quality, Piedmont Regional Office, and by the federal CCR rule, 40 CFR Part 257, Subpart D. The CCR unit is a new CCR landfill under that rule.
Location restrictions 40 CFR 257.60–257.64; 257.107(e)
Demonstrations, certified by a qualified professional engineer, that the CCR unit meets each location restriction. Required before the unit first receives CCR and for each cell before construction. Retained until closure of the unit is complete.
| Document | Rule citation | Placed in operating record | Posted | File |
|---|---|---|---|---|
| Placement above the uppermost aquifer demonstration | 257.60(a); 257.105(e)(1) | — | — | Not yet required |
| Wetlands demonstration | 257.61(a); 257.105(e)(2) | — | — | Not yet required |
| Fault areas demonstration | 257.62(a); 257.105(e)(3) | — | — | Not yet required |
| Seismic impact zones demonstration | 257.63(a); 257.105(e)(4) | — | — | Not yet required |
| Unstable areas demonstration | 257.64(a); 257.105(e)(5) | — | — | Not yet required |
Design criteria 40 CFR 257.70–257.71; 257.107(f)
Certifications that the liner and leachate collection system were designed and constructed to the rule's requirements. The design certification is posted within 60 days of the start of construction; the construction certification before the unit first receives CCR.
| Document | Rule citation | Placed in operating record | Posted | File |
|---|---|---|---|---|
| Design certification, alternative composite liner and leachate collection system | 257.70(e); 257.105(f)(1) | — | — | Not yet required |
| Construction certification, composite liner and leachate collection system | 257.70(f); 257.105(f)(1) | — | — | Not yet required |
| Documentation of liner type | 257.71(b); 257.105(f)(1) | — | — | Not yet required |
| Design and construction plans and permit application | 257.105(f)(21) | — | — | Not yet required |
Operating criteria 40 CFR 257.80–257.84; 257.107(g)
Plans for controlling fugitive dust and stormwater, and the inspection reports that show they are being followed. The dust report and the engineer's inspection report are posted annually.
| Document | Rule citation | Placed in operating record | Posted | File |
|---|---|---|---|---|
| CCR Fugitive Dust Control Plan | 257.80(b); 257.105(g)(1) | — | — | Not yet required |
| Annual CCR Fugitive Dust Control Report | 257.80(c); 257.105(g)(2) | — | — | Not yet required |
| Run-on and Run-off Control System Plan | 257.81(c); 257.105(g)(3) | — | — | Not yet required |
| Weekly inspection records summary | 257.84(a); 257.105(g)(8) | — | — | Not yet required |
| Annual inspection report by a qualified professional engineer | 257.84(b); 257.105(g)(9) | — | — | Not yet required |
Groundwater monitoring and corrective action 40 CFR 257.90–257.98; 257.107(h)
Certifications for the groundwater monitoring system and statistical methods, the annual groundwater report (due by January 31 each year), and any notices of statistically significant results and the response to them.
| Document | Rule citation | Placed in operating record | Posted | File |
|---|---|---|---|---|
| Groundwater monitoring system certification | 257.91(f); 257.105(h)(1) | — | — | Not yet required |
| Statistical method certification | 257.93(f)(6); 257.105(h)(2) | — | — | Not yet required |
| Annual Groundwater Monitoring and Corrective Action Report | 257.90(e); 257.105(h)(1) | — | — | Not yet required |
| Notifications of statistically significant increases or levels, if any | 257.94(e), 257.95(g); 257.105(h)(3), (h)(6) | — | — | Not yet required |
| Alternate source demonstrations, if any | 257.94(e)(2), 257.95(g)(3); 257.105(h)(3), (h)(7) | — | — | Not yet required |
Closure and post-closure care 40 CFR 257.100–257.104; 257.107(i)
The current closure and post-closure plans, and notices and progress reports as closure proceeds. The approved closure method for this unit is removal of CCR.
| Document | Rule citation | Placed in operating record | Posted | File |
|---|---|---|---|---|
| Written Closure Plan | 257.102(b); 257.105(i)(4) | — | — | Not yet required |
| Written Post-Closure Plan | 257.104(d); 257.105(i)(12) | — | — | Not yet required |
| Notification of intent to close | 257.102(g); 257.105(i)(5) | — | — | Not yet required |
| Annual closure progress report | 257.102(h); 257.105(i)(6) | — | — | Not yet required |
| Notification of completion of closure | 257.102(h); 257.105(i)(7) | — | — | Not yet required |
Posting history
Every change to this page is logged here, newest first.
| Date | Change |
|---|---|
| 2026-11-09 | Page established. No documents yet required to be posted; the facility has not begun construction or received CCR. |
Document files are stored at /skippers-ccr/documents/ and named YYYY-MM-DD_section_short-title.pdf. If the address of this page changes, EPA and Virginia DEQ are notified within 14 days as the rule requires.